| |
Recent Additions to COPA Website
- Articles
- Charts
- COPA received the following water flow charts from the U.S.
EPA (6/15/98). The data was generated by CBS (Westinghouse).
These charts are in pdf format.
- Illinois Central
Spring, April 15-19, 1998 storm - charts flow, PCB levels,
and conductivity
- Illinois Central Spring Flow
& Rain 4/1/98 0000 to 4/30/98 2300 - charts flow and
rainfall
- Illinois Central Spring Flow
& Conductivity 4/1/98 to 4/30/98 2300 - charts flow and
conductivity
- Illinois Central Spring Flow Record January
to July 1996 - time chart in 20 day increments
- Illinois Central Spring Flow Record August
to December 1996 - time chart in 20 day increments
- Illinois Central Spring Storm Flows - charts flow, PCB levels,
and conductivity from May
to June 1997
- Neal's Landfill
Springs Flow & PCB, April 15-19, 1998 - charts flow, PCB
levels, and conductivity at both the North and South Springs
- Conard's Branch
from Neal's Landfill Flow and Rain, April 15-19, 1998 - charts
flow and cumulative rain
- Stout's Creek,
April 15-19, 1998 storm - charts flow and PCB levels Up, West
and Down
- EPA chart
for selection of cleanup remedy at Neal's Landfill.
- Legal
- Environmental Rules and Regulations
- This law dictates the cleanup standards that apply in Bloomington,
Indiana. See General Rules, paragraph (1), first sentence.
- 42 USCA Sec.
9621. United States Code Annotated: Title 42. The Public
Health and Welfare: Chapter 103 - Comprehensive Environmental
Response, Compensation, and Liability: Subchapter I - Hazardous
Substances Releases, Liability, Compensation
- 40 CFR Parts
750 and 761: Disposal of Polychlorinated Biphenyls (PCBs);
Final Rule (File size 641k - about 3.9 minutes at 28.8)
- Modification
of Neal's Landfill cleanup plan
- Judge Foster recommends
changing cleanup schedule to the end of 2000
- Letters
- COPA
- Fish & Wildlife Service, Department of the Interior
- Letter to Tom
Alcamo, USEPA (April 2, 1998) concerning the US EPA's Statement
of Work for the Design and Removal Actions at theWinston Thomas
Wastewater Treatment Plant with comments on the proposed soil
depth in the abandoned lagoon.
- Monroe County Health Board
- Letter to Judge
Foster (March 3, 1998) expressing concerns about the thoroughness
of the cleanup of PCBs in Monroe County, Indiana.
- Private Individuals
- Maps
- Lemon Lane
- Neal's Landfill
- Soil Boring and Geological
Survey
- On June 5, 1998, COPA received from the U.S. EPA, interpolation
of maximum detects of PCBs in soil maps for various depths in
the landfill. The May 1998 maps were scanned and converted to
Adobe Acrobat Reader format (.pdf) and average about 166K in
size.
- PCB concentration 0-3
feet below ground level.
- PCB concentration 3-10
feet below ground level.
- PCB concentration 10-15
feet below ground level.
- PCB concentration 15-20
feet below ground level.
- PCB concentration 20-26
feet below ground level.
- PCB concentration more
than 26 feet below ground level.
- EPA map
showing hot spots greater than 500 ppm.
- EPA map
showing proposed excavation areas.
- Meetings
- Memos
- Reports
- Cambrian
Ground Water Co. cleanup position paper summary
- Weekly Reports
on Winston Thomas Cleanup Work completed
- Westinghouse / CBS
- COPA received from US EPA (on 7/13/98) the CBS document "A Natural-Potential
Survey around Lemon Lane Landfill, Bloomington, Indiana for
Westinghouse Electric Corporation/CBS, April/May 1998".
- Conceptual Plan
for Investigation of Karst Conduits in the Vicinity of Lemon
Lane Landfill (May 18, 1998)
- Abandoned Lagoon Revised
Excavation Information
- Preliminary Data
for Sampling Performed Under Bloomington Project QAPjP, Volume
IX, Neal's Landfill Stream Investigation Field Sampling Plan
dated 29 June, 1998
- Preliminary Data
for Sampling Performed Under Bloomington Project QAPjP, Volume
X, Bennett's Quarry Stream Investigation Field Sampling Plan dated
June 29, 1998.
- Lemon Lane underground conduit
study update January 1999
|
|