PSARA Technologies, Inc.
PROJECT MEMORANDUM
Winston-Thomas Remediation Project
Date: May 26,1998
To: See Distribution
From: Mike Hessling
Subject: Weekly Progress Report - May 19 - 24, 1998
DISTRIBUTION
|
Dottie Alke, CBS |
Tom Alcamo, USEPA |
|
Jim Patrick, CBS |
Resa Ramsey, IDEM |
|
Ray Taylor, CBS |
John Langley, CBU |
|
Bill Melilli, CBS |
Bette Conway, CBU |
|
Mike Hessling, PSARA |
Dennis Williamson, Monroe County |
|
Todd Scoville, BB&L |
|
|
Mark Bertram, Koester |
|
This report is prepared weekly by PSARA Technologies to document
project activities at the Winston Thomas site. In addition, the
report provides a vehicle for transmitting analytical results,
air monitoring records, waste shipping information, site progress
maps, field changes, and other progress information to off-site
regulatory personnel.
Comments or questions regarding this report should be directed
to Mr. Jim Patrick of CBS at (812) 335-8780 or Mr. Mike Hessling
at (812) 335-0424.
SPECIFIC SITE ACTIVITIES INITIATED/CONTINUED/COMPLETED
THIS WEEK
General Site Activities:
The following mobilization and site set-up activities were
completed last week:
- All field offices, as well as sanitary and garbage facilities
were set up this week.
- Phones and electricity were installed.
- A 1.5" water meter was installed at the fire hydrant
and water lines were run to the command post and to the trickling
filter contamination reduction zone.
- The guard house was delivered. Security services started
5/26198.
- PUF air sampling stations were set up around the trickling
filter. The meteorological station was installed above the digesters.
Sludge Drying Beds:
- The excavation of the sludge drying beds, based on the sampling
results, was discussed with and approved by the government representatives
(USEPA, IDEM, City of Bloomington and County of Monroe) during
a conference call on May 19, 1998. The status of excavation of
the perimeters of Drying Beds 1, 2, and 3 is addressed as an
interim report in this and future weekly reports. A final report
will be prepared and submitted following completion of the excavation
and verification sampling.
- Delineation sampling and excavation activities have been
completed around Drying Beds 2 and 3. Post-excavation sampling
was performed on all grids. All final analytical results are
below 25 ppm. The enclosed figures show the final excavation
areas for both beds. A total of 4 grids were excavated around
Bed 2, and 9 grids around Bed 3. During the May 26 weekly meeting
the City of Bloomington agreed that the clean stone processed
from the trickling filter can be used as backfill for these excavated
grids.
- To date, 7 grids have been excavated from the perimeter of
Drying Bed 1. At least 12 grids remain to be excavated, and delineation
sampling is continuing. On Friday, 5/22/98, CBS elected to sample
all of the remaining grids adjacent to the north edge of the
drying bed. This sampling will be completed this week. The enclosed
map of Drying Bed #1 shows the current status of excavation and
sampling.
- A total of 248 tons of material were shipped in 10 loads
to EQ in Michigan as TSCA waste.
Trickling Filter (TF) Project
- Pavement was placed for the trickling filter treatment system
on Thursday, 5/21/98. Rain on Friday and Saturday prevented completion
of the paving (installation of curbs), but is being completed
5/26/98.
- The screening equipment was delivered to the site and will
be installed as soon as the paving is finished.
- BB&L has requested a field change to the work plan that
would eliminate the HDPE liner beneath the asphalt. The hot asphalt
would melt the liner during installation. This field change is
described in the attached memorandum: Field Change No. I - Paving,
which was reviewed and verbally approved at the May 26 weekly
meeting.
- BB&L has requested a field change to the work plan that
would reconfigure the layout of the asphalt pad. This field change
is described in the enclosed memorandum: Field Change No. 2 -
Waste Stockpile Area, which was reviewed and verbally approved
at the May 26 weekly meeting.
- The gate valves (2) on the south side of the trickling filter
were sealed with concrete. The City approved sealing these valves
by pouring concrete into the sump on the downstream side of the
valves (i.e., outside the trickling filter) The concrete was
poured on Tuesday, May 26.
- Because only limited excavation was performed this week,
no personnel samples were collected. The met station was not
fully operational until Friday morning, so prevailing wind directions
were determined using a wind sock mounted above the digesters.
Future weekly reports will include air sample logs and met station
reports.
ACTIVITIES PLANNED FOR THE COMING WEEK
Drying Beds:
- Sample remaining grids along north side of Drying Bed #1.
- Excavate remaining impacted grids. The excavation of Drying
Bed Perimeter #1 is not a critical path activity, and will be
accomplished as time allows.
Trickling Filter:
- Continue set-up of processing area
- Sample water in Trickling Filter. Discharge if possible.
- Sample stockpiled pipe to determine appropriate disposal
options.
- Conduct process optimization tests of shaker screen.
Abandoned Lagoon:
- Continue sampling 53 "shallow" grids (Tuesday &
Wednesday)
- Mobilize Geoprobe - Sample 14 deeper grids identified by
USEPA (Wednesday)
- Geoprobe sample any of the 53 shallow grids that show PCBs
above 25 ppm. (Thursday and Friday)
Tertiary Lagoon:
- Continue mobilization and set-up activities.
ATTACHMENTS
All files below are in Adobe Acrobat ".pdf"
format.
|
|