Table of Contents
CIC Meeting
Lemon Lane Landfill.Deposition Analysis Assumptions
Lemon Lane Landfill.Deposition Analysis Assumptions
PPT Slide
Lemon Lane Landfill
Lemon Lane Landfill
PPT Slide
PPT Slide
PPT Slide
PPT Slide
Lemon Lane Landfill.Average Air Emission Results (ng/m3)
PPT Slide
PPT Slide
PPT Slide
PPT Slide
PPT Slide
Lemon Lane Landfill Piezometers
PPT Slide
PPT Slide
PPT Slide
PPT Slide
PCB Removal Summary.Winston Thomas, Bennett’s Dump, Neal’s Dump, Neal’s Landfill, Anderson Road Landfill, Lemon Lane Landfill, West Side Clear Creek, Fell Iron, ABB Plant, ISF, Other Sites
ICS Water Treatment Plant.Operational History As of November 1, 2000
ICS Water Treatment Plant.Bypass
ICS Water Treatment Plant.Bypass
PPT Slide
PPT Slide
Quarry Springs Investigation
PPT Slide
PPT Slide
PPT Slide
PPT Slide
Neal’s Landfill.October 5, 2000 Storm Water Sampling
Neal’s Landfill.April 1998 Sampling Results
Neal’s Landfill.October 5, 2000 Sampling Results
Neal’s Landfill.Comparison of April 1998 & October 2000 Sample Events
PPT Slide
PPT Slide
PPT Slide
PPT Slide
PPT Slide
PPT Slide
PPT Slide
|
Author: U.S. EPA Region V
Email: alcamo.tom@epa.gov
Home Page: www.epa.gov
|